Thorp Air Command - T18.net
http://t18.net/thorpforum/

C-FPVE
http://t18.net/thorpforum/viewtopic.php?f=36&t=7216
Page 5 of 17

Author:  Rich Brazell [ Sun Mar 10, 2013 10:28 pm ]
Post subject:  Re: C-FPVE

I might be wrong ,but those rivets look like soft rivets ? Go to the NL's and they will tell you how to buck the stab (AN hard ) rivets and the type of bucking bar to use . Yes it is a LONG one . For the ribs and skin I used Cherry Max rivets . BOOM ! You are doing wonderful work !

RB O0

Author:  Pacer 20 [ Thu Apr 04, 2013 10:25 pm ]
Post subject:  Re: C-FPVE

Hi.

Too much work at the airport! Spring fever in Quebec and all the planes broke at the same times.

So there is new updates about my T-18.
Enjoy.

Forward tunnel finished and transfer box installed.

Image

Image

Another small part out of tolerance!

Image

Now it's better!

Image

Image

Brand new rudder. Lot of work!

Image

Image

Image

Finally the fuselage is ready to go for the final act. Riveting!!!

Image

My father with the rudder. Look like a boat at this time.

Image

More photos tomorrow ;)

Cheers

Author:  Rich Brazell [ Thu Apr 04, 2013 10:29 pm ]
Post subject:  Re: C-FPVE

You do beautiful work ! :)

RB O0

Author:  leewwalton [ Fri Apr 05, 2013 9:32 am ]
Post subject:  Re: C-FPVE

Yes!! has anyone else noticed what a craftsman Thierry is? We may have to fly him down here to teach us a thing or two! NICE WORK!!!

Author:  stug [ Fri Apr 05, 2013 4:02 pm ]
Post subject:  Re: C-FPVE

I have noticed the fine workmanship, if you are going to send Thierry somewhere make it Australia, I could use some of those skills on my project!

Author:  Rich Brazell [ Fri Apr 05, 2013 11:16 pm ]
Post subject:  Re: C-FPVE

Thierry has turned an aircraft that I would only use as a static display (not sure how it ever got certified to fly ?) , into a thing of beauty ! ;) His attention to detail is second to none ! California is a lot closer than Down Under ! BOOM ! If this Master of the metal ever does make it to California for a fly in , a clinic on metal bending is in order and I will buy him dinner ! BADA BING !

RB O0

Author:  Pacer 20 [ Sat Apr 06, 2013 1:38 pm ]
Post subject:  Re: C-FPVE

Hi guy's.

First person to buy me a aircraft ticket for a crash sheet metal course is the winner.
Many thanks everybody for the good comments. For me the metal is talking. I work in small aviation for the last 15 years. I rebuilded warbird and small plane.
Give me a old vintage radio button and I built Mustang or a Fying Fortress! And don't forget the $$$ ;D

Fuselage is in a homemade jig. All the parts was level and the dimensions was in tolerance.

Image

I start by the tail section.

Image

Tail are in place for the first bolt on test.

Image

Good riveting hours. I'm very happy!!!

Image

Image

I hope I finish riveting the tail section and the bottom skin for the next friday. :)

En plus with the sheet metal class I give you free French lesson! ;) (I now I need English lesson too :-[ )
Et voila!

Author:  Pacer 20 [ Sun Apr 07, 2013 8:26 am ]
Post subject:  Re: C-FPVE

Vertical fin skin is bending. This morning all the rib was in place and everything is almost drill.

Image

Image

Image

Ok, it's time for a coffee breake. Wife and kids are awake and I have to go work on my kitchen.
Sunday morning pancake! Hum...with fresh Canadian maple syrop ::)

Cheers

Author:  Pacer 20 [ Sun Apr 07, 2013 8:16 pm ]
Post subject:  Re: C-FPVE

There is the final product.
Ready for the dimplig and priming.
I hope tomorrow I finish riveting the rear fuselage section.

Image

Author:  Pacer 20 [ Tue Apr 09, 2013 8:04 pm ]
Post subject:  Re: C-FPVE

Good vertical part installed. Not the final version but looks good. I want to scratch built a small fin on the front, just for the good look or the WOW effect!

Image

Fuselage on the side same as a whale on a beach sand. Bottom skin is riveting during lunch. Yep! I eat my sandwich between two bulkhead station.

Image

I buy a cheap Tempo to made a easy paint boot. There some rudder parts during the drying time and ready to go!

Image

I know tomorow it's groundhog day. Another riveting lunch time :-\

Author:  Rich Brazell [ Tue Apr 09, 2013 10:59 pm ]
Post subject:  Re: C-FPVE

Who helps you with the riveting or do you have long arms like a monkey ? ::)

RB O0

Author:  James Grahn [ Wed Apr 10, 2013 10:51 am ]
Post subject:  Re: C-FPVE

Outstanding. I wish I had half those skills or energy.
Cubes

Author:  Pacer 20 [ Fri Apr 12, 2013 2:34 pm ]
Post subject:  Re: C-FPVE

Bonjour!

Fresh updates to my projects. Vertical fin parts primed.

Image

Doubler was installed on fin spar and rudder is ready for riveting.
Image

Vertical fin is finished. I have to found the fiber glass cover for the top. I check on the old forum, I'm sure I found something interesting.
Image

Rudder completed!
Image

I'm almost finish the belly skin riveting. My father don't have the time to come and help me to do the job.
One big hours and it's over!
Image

Next step monday morning. I start to check the stabilisator plan and I think I hit the wall when I start this parts!
To be continue ;)

Author:  Rich Brazell [ Fri Apr 12, 2013 6:13 pm ]
Post subject:  Re: C-FPVE

Hey don't ya know , I still don't under stand how you do all the riveting by yourself if your Dad is not available ? The stab is a Sticky Wicket , especially bucking the rivets inside the "tube." With your level of metal working it should not be a problem . ;) Are you going to paint the AC or spend hours and days polishing the beast ? :o

RB O0

Author:  Pacer 20 [ Sun Apr 14, 2013 10:02 am ]
Post subject:  Re: C-FPVE

Hey Rich, my dear pen pal!

I use the "force" to install all the rivet. Same as Luke Skywalker! I have to be careful to not turn myself to the "dark side"...I don't want to finish the plane with cherry max;-) I know it's faster but...

I paint my plane by myself. Aluminium polishing is not my hobby.

Cheers guy's.
Maybe in 2015 @Lakeland!

Page 5 of 17 All times are UTC - 6 hours [ DST ]
Powered by phpBB® Forum Software © phpBB Group
https://www.phpbb.com/